Applying for Construction Scheduler - Memphis at SpaceXSI? Compare this live job with your resume first.

🎯 Tailor my resume
←Jobiba.Me
S
Active1mo ago

Construction Scheduler - Memphis

SpaceXSI·📍 Southaven, Mississippi, United States

Employment

Full-Time

Work mode

On-site

Experience

4+ years

Salary

Not disclosed

Salary not disclosed

Check market pay for comparable Construction Scheduler roles before applying.

Salary →

Role overview

Job description

SpaceX was founded under the belief that a future where humanity is out exploring the stars is fundamentally more exciting than one where we are not. Today, SpaceX is actively developing the technologies to make this possible, with the ultimate goal of making life multiplanetary and expanding consciousness to the stars. SpaceXSI is building Super Intelligence to help humanity understand the universe. Our teams are building the full Super Intelligence stack: from our Colossus supercomputers, to Grok models, to our suite of applications, including Grok Bot, Grok Build, Grok Imagine, Grok Voice, and X. We're creating a powerful flywheel where more compute trains better models, better models power more useful products, and what we learn from people using those products shapes what we build next. CONSTRUCTION SCHEDULER Develop, maintain, and communicate construction schedules that the field, subcontractors, and leadership can actually use. You will build CPM baselines, update them from real progress, flag risk early, and explain schedule impact of changes, delays, and recovery plans. This is not a data-entry role. You need enough means-and-methods knowledge to challenge a sequence that will not work in the field. Superintendents run the work; project managers own cost and contracts; the scheduler is the person who can tell you what is actually driving the end date, what slips if a trade is late, and whether a recovery plan is real. RESPONSIBILITIES: Build baseline CPM schedules from drawings, specs, estimates, bid packages, and construction sequences (WBS, activity coding, logic, calendars, and constraints used sparingly and correctly) Maintain the live schedule: collect progress from superintendents, project managers, and trades; update percent complete, remaining duration, and logic; publish a clean current-period update on a set cadence (typically weekly look-aheads and monthly official updates) Own the critical path. Identify near-critical work, float erosion, and out-of-sequence progress. Tell the team why the end date moved, not just that it did Produce three-week (or similar) look-aheads that match the master schedule and what the field can actually crew Analyze schedule impact of RFIs, change orders, design late-outs, access constraints, long-lead procurement, weather, and labor shortages. Prepare time-impact analyses (TIA) and what-if, recovery, and acceleration scenarios Coordinate with project managers, superintendents, estimators, procurement, design, owners/CMs, and subcontractors so the schedule reflects committed dates, not wishful ones Resource-load and, where required, cost-load the schedule. Flag crew stacking, craft shortages, and unrealistic production rates Prepare narratives, variance reports, S-curves, histograms, and executive summaries for internal reviews and owner/CM submittals Support claims and delay documentation with contemporaneous records (as-planned vs. as-built, fragnets, delay categorization) when needed Enforce schedule standards: naming, coding, update process, backup, and version control so the file remains auditable Facilitate or support pull-planning / Last Planner sessions and convert those commitments into logic in the CPM model Visit the site regularly. A scheduler who never walks the job will be wrong BASIC QUALIFICATIONS: 4+ years of construction scheduling on active projects (GC, CM, owner’s project controls, or specialty contractor) 4+ years of experience using Smartsheet, MS Project, or other project management tool 4+ years of experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics) PREFERRED SKILLS AND EXPERIENCE: Comfortability with multiple calendars, relationship types, filters, layouts, global vs. project data, and schedule quality checks (open ends, negative float, SS/FF overuse, constraints) Bachelor’s in construction management, civil engineering, or a related field; OR equivalent field experience PSP (AACE), PMI-SP, PMP, CCM, or similar credential Experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics) Forensic delay analysis, time-impact analysis, and claims support Cost/resource loading, earned value, and integration with cost systems Last Planner / pull planning; BIM 4D (Navisworks, Synchro) is a plus Additional tools as applicable: Power BI, Smartsheet, Procore, Autodesk Construction Cloud ADDITIONAL REQUIREMENTS: Willing to work extended hours as needed, including the current 6-day / 12-hour construction cadence Must be comfortable working in a fully onsite environment SpaceXSI is an equal opportunity employer. For details on data processing, view our Recruitment Privacy Notice .

More like this

About this listing

  • Source: SpaceXSI's official careers site · still listed there on 12 Nov 2026
  • Posted 18 Sept 2026

Jobiba never charges you to apply. Never pay to apply or share OTPs, card or bank details.

What they are looking for

Skills & requirements

Qualification

4+ years of construction scheduling on active projects (GC, CM, owner’s project controls, or specialty contractor). 4+ years of experience using Smartsheet, MS Project, or similar and comfortability with multiple calendars, relationship types, filters, layouts, global vs. project data, and schedule quality checks (open ends, negative float, SS/FF overuse, constraints). 4+ years of experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics). PREFERRED SKILLS AND

Department · Data Center

Hiring company

SpaceXSI

Energy

View the company profile, current openings and hiring details.

Related opportunities

Similar active roles

Relevant, currently active roles for this market.

All jobs →

🔔 Get job alerts

New Construction Scheduler jobs in Southaven, Mississippi, United States, straight to your inbox.

No spam · Unsubscribe anytime

Jobiba never asks job seekers for money. Stay safe